State-Wide Power Distribution Overview

Uttar Pradesh Power Corporation Limited — Consolidated Performance FY 2023-24

92,000MUTotal Units Sold
35,000CrTotal Revenue
📉
29.5%AT&C Losses
🏗
1,240+nosTotal Substations
👥
3.8 CrnosTotal Consumers
📊
₹4.10/kWhAvg. Tariff Rate

Revenue by DISCOM (₹ Crore)

FY 2023-24

AT&C Loss Distribution

% per DISCOM

Units Sold (MU)

DISCOM-wise

Consumer Base by DISCOM

Lakh consumers

DISCOM Consolidated Summary

All 5 DISCOMs · FY 2023-24
DISCOMZoneDistrictsRevenue (₹ Cr)Units Sold (MU)AT&C Loss %Consumers (Lakh)SubstationsAvg Tariff ₹/kWhStatus

DISCOM Profiles

Detailed operational and financial profile of each distribution company

Substation Directory

All major 33/11 kV, 132 kV, and 220 kV substations across UP

Showing all substations
#Substation NameDISCOMDistrictVoltageTypeCapacity (MVA)Load Factor %AT&C Loss %ConsumersStatus

Revenue & Tariff Analysis

Approved tariff schedule, revenue realization, and ACS-ARR gap

UPERC Approved Tariff Schedule — FY 2025-26
Supply at 11 kV
Demand: ₹350/kVA/monthEnergy: ₹8.50/kVAh
11 kV – 66 kV
Demand: ₹340/kVA/monthEnergy: ₹8.40/kVAh
66 kV – 132 kV
Demand: ₹330/kVA/monthEnergy: ₹8.25/kVAh
Minimum Charge
₹1,125/kVA/month

Revenue Trend (₹ Cr)

FY22 vs FY23 vs FY24

ACS vs ARR Gap (₹/kWh)

Per DISCOM

Revenue Realization — DISCOM Wise

FY 2023-24
DISCOMRevenue (₹ Cr)Power Purchase (₹ Cr)O&M Cost (₹ Cr)ARR (₹/kWh)ACS (₹/kWh)Gap (₹/kWh)Collection Eff. %Subsidy (₹ Cr)

Losses & AT&C Analysis

Technical losses, commercial losses, and aggregate AT&C performance

⚠️
21.0%Avg Technical Loss
💸
8.5%Avg Commercial Loss
📉
29.5%Aggregate AT&C Loss
🎯
15.0%RDSS Target AT&C

Technical vs Commercial Loss Breakdown

Per DISCOM

AT&C Loss Trend (2020-2024)

State Average

Loss Analysis — DISCOM Wise

DISCOMInput Energy (MU)Units Sold (MU)Tech Loss %Comm Loss %AT&C Loss %RDSS Target %Gap to TargetEnergy Lost (MU)Revenue Loss (₹ Cr)

Technical Infrastructure Data

Network assets, transformer capacity, line length, and reliability indices

Transformer Capacity (MVA)

By DISCOM

Network Line Length (km)

HT + LT Lines

Technical Infrastructure — DISCOM Wise

DISCOM220kV S/S132kV S/S33kV S/STotal S/SDTR CountHT Line (km)LT Line (km)Capacity (MVA)Peak Load (MW)Load Factor %SAIFISAIDI (hrs)

Smart Metering & RDSS Progress

As of March 2024
DISCOMTotal ConsumersSmart MetersSmart Meter %RDSS Capex (₹ Cr)RDSS Progress %Feeder Sep. %DT Metering %